Prepare for the Georgia Septic Installer Test. Utilize flashcards and multiple-choice questions, each providing hints and explanations. Ensure your success!

Practice this question and more.


How far should an absorption field be installed from buildings without basements or property lines?

  1. 5 feet

  2. 10 feet

  3. 15 feet

  4. 20 feet

The correct answer is: 5 feet

The appropriate distance for installing an absorption field from buildings without basements or property lines is determined by health and safety regulations that aim to minimize the risk of contamination and ensure effective wastewater treatment. The correct distance of 5 feet allows for sufficient space for the absorption field while also considering the practicalities of land use and property development. This proximity still provides adequate functionality for the absorption field, promoting effective drainage and reducing the potential for blockage or overflow. The rationale behind this specific distance is based on the need to maintain a suitable environment for the natural processes involved in wastewater treatment, ensuring that effluent is adequately absorbed into the soil while minimizing negative impacts on nearby structures. Therefore, adhering to this guideline is essential for both compliance with regulations and the protection of public health.