Can physical development for a structure utilizing an on-site sewage management system begin before obtaining a permit?

  1. Yes

  2. No

  3. Only with verbal approval

  4. Only if it's a small project

The correct answer is: No

Obtaining a permit before the physical development of a structure utilizing an on-site sewage management system is a legal requirement. This ensures that the system is designed and installed according to appropriate codes and regulations. The permitting process typically includes evaluations of soil conditions, site plans, and compliance with local health standards, all of which are crucial for ensuring that the sewage management system functions properly and does not pose environmental or health risks. Starting construction without a permit could result in legal repercussions, including fines or the need to remove or redo work that does not meet standards. It is essential to follow these guidelines to ensure the safety and efficacy of sewage management practices and to uphold public health standards. Thus, physical development cannot commence until the necessary permits are secured.